Tabuk Cement’s announcement on development of clinker line

30/09/2013 Argaam

Reference to the announcement on Tadawul on 31/7/2013 regarding the test operation of the 4000 tonnes/day clinker production line with an enhanced capacity of 4400 tonnes/day, Tabuk Cement would like to clarify that the line’s maximum capacity was raised to 4200 tonnes, and in order to reach the estimated 4400 tonnes, some instrumental technical amendments need to be done. Such amendments will necessitate a long stoppage which shall affect the company’s clinker and cement inventories. So, the company decided to postpone the consideration of the above target until completion of the second line project.

Developments will be announced on time.

Comments {{getCommentCount()}}

Be the first to comment

{{Comments.indexOf(comment)+1}}
{{comment.FollowersCount}}
{{comment.CommenterComments}}
loader Train
Sorry: the validity period has ended to comment on this news
Opinions expressed in the comments section do not reflect the views of Argaam. Abusive comments of any kind will be removed. Political or religious commentary will not be tolerated.

Most Read