| Last Trade | 8.25 |
| Change | (0.27) |
| Change (%) | (3.17) |
| Open | 8.55 |
| Low | 8.18 |
| High | 8.55 |
| Prev. Close | 8.52 |
| Change (3M) | 7.56 % |
| Change (6M) | 19.22 % |
| Volume | 3,682,684 |
| Turnover | 30,606,241.00 |
| Transactions | 4,745 |
| Market Value | 18,128.22 |
| Avg. Volume (3M) | 9,538,205.22 |
| Avg. Turnover (3M) | 71,508,396.71 |
| Avg. Transaction (3M) | 3,719.45 |
| Change (12M) | (2.02 %) |
| YTD | (0.12 %) |
|
Event Date
|
Event
|
||
|---|---|---|---|
|
29-09-2025
|
General Assembly | ||
|
28-05-2025
|
General Assembly | ||
|
23-10-2024
|
General Assembly | ||
|
05-06-2024
|
General Assembly | ||
|
07-06-2023
|
General Assembly | ||
| More | |||
| Report | Interim | Year |
| Petro Rabigh trims 9M 2025 net loss to SAR 3.29B; Q3 at SAR 1.24B | 9 M | 2025 |
| Petro Rabigh loses SAR 2.1B in H1 2025, SAR 1.4B in Q2 | 6 M | 2025 |
| Petro Rabigh loses SAR 691M in Q1 2025 | 3 M | 2025 |
| Petro Rabigh posts SAR 4.54B loss in 2024; Q4 at SAR 779.3M | 12 M | 2024 |