| Last Trade | 6.89 |
| Change | (0.24) |
| Change (%) | (3.37) |
| Open | 7.15 |
| Low | 6.86 |
| High | 7.15 |
| Prev. Close | 7.13 |
| Change (3M) | (16.99 %) |
| Change (6M) | (8.38 %) |
| Volume | 1,606,966 |
| Turnover | 11,183,915.00 |
| Transactions | 3,240 |
| Market Value | 15,139.81 |
| Avg. Volume (3M) | 2,043,148.56 |
| Avg. Turnover (3M) | 14,474,218.71 |
| Avg. Transaction (3M) | 2,162.15 |
| Change (12M) | (11.21 %) |
| YTD | 0.73 % |
|
Event Date
|
Event
|
||
|---|---|---|---|
|
29-09-2025
|
General Assembly | ||
|
28-05-2025
|
General Assembly | ||
|
23-10-2024
|
General Assembly | ||
|
05-06-2024
|
General Assembly | ||
|
07-06-2023
|
General Assembly | ||
| More | |||
| Report | Interim | Year |
| Petro Rabigh trims 9M 2025 net loss to SAR 3.29B; Q3 at SAR 1.24B | 9 M | 2025 |
| Petro Rabigh loses SAR 2.1B in H1 2025, SAR 1.4B in Q2 | 6 M | 2025 |
| Petro Rabigh loses SAR 691M in Q1 2025 | 3 M | 2025 |
| Petro Rabigh posts SAR 4.54B loss in 2024; Q4 at SAR 779.3M | 12 M | 2024 |