| Last Trade | 7.30 |
| Change | (0.15) |
| Change (%) | (2.01) |
| Open | 7.28 |
| Low | 7.27 |
| High | 7.36 |
| Prev. Close | 7.45 |
| Change (3M) | 10.53 % |
| Change (6M) | 6.43 % |
| Volume | 330,330 |
| Turnover | 2,414,196.00 |
| Transactions | 297 |
| Market Value | 16,062.70 |
| Avg. Volume (3M) | 9,576,142.03 |
| Avg. Turnover (3M) | 72,042,270.00 |
| Avg. Transaction (3M) | 3,613.08 |
| Change (12M) | (11.31 %) |
| YTD | (9.81 %) |
|
Event Date
|
Event
|
||
|---|---|---|---|
|
29-09-2025
|
General Assembly | ||
|
28-05-2025
|
General Assembly | ||
|
23-10-2024
|
General Assembly | ||
|
05-06-2024
|
General Assembly | ||
|
07-06-2023
|
General Assembly | ||
| More | |||
| Report | Interim | Year |
| Petro Rabigh trims 9M 2025 net loss to SAR 3.29B; Q3 at SAR 1.24B | 9 M | 2025 |
| Petro Rabigh loses SAR 2.1B in H1 2025, SAR 1.4B in Q2 | 6 M | 2025 |
| Petro Rabigh loses SAR 691M in Q1 2025 | 3 M | 2025 |
| Petro Rabigh posts SAR 4.54B loss in 2024; Q4 at SAR 779.3M | 12 M | 2024 |